Before garage drywall starts, move the cars out, clear the walls, and make sure nothing behind them is wet or unfinished. Garage drywall starts around $1,200 per garage. We price it from photos before anything is booked, and the price depends on the garage size, whether the ceiling needs boarding and the finish you want. Here is what to do, in order.
What do I need to move out of the garage?
Move everything that touches a wall or sits under the part of the ceiling we are working on.
- Both cars, if they fit outside for the length of the job.
- Shelving units, racks, pegboard and anything screwed to the studs. Take down what you can. If something is bolted on, tell us before we arrive.
- Bikes, ladders, lawn gear and boxes stacked against the walls.
- Loose items in the middle of the garage that could get dusty or knocked over.
If you cannot empty the whole garage, aim for four to five clear feet around the walls and a clear floor under the ceiling. The more we have to move, the longer the job takes. Boarding goes faster when the walls are clear, and a cluttered room slows it down.
What about the garage door, the opener and the wiring?
Leave the garage door opener where it is, but tell us where it is mounted so we can board around it. Have a licensed electrician install and inspect any new outlets, switches or wiring before the board goes up. Once the wall is closed, any change means cutting it open again. If you want a new outlet, a light, or a line run for a mini-split, get the electrician or AC tech in first.
Is the wall between garage and house ready?
Check this part before we arrive. The wall shared with the house generally needs at least half-inch board on the garage side. A garage ceiling with rooms above it generally needs 5/8-inch type X board. In both cases the joints need to be taped and finished so the fire separation is continuous.
Look for holes where pipes or wires pass through the wall. If any framing is damaged, get it repaired before any board goes up. That is a framing job, not a drywall one. Tell us about anything you are unsure of.
If you want to know what board is likely to be needed, text us a photo and we will tell you what we can see from it. We confirm the board type against what is actually on site. Your local building department has the final word on requirements.
What should I check on a lanai before it is boarded?
A lanai conversion is a high-humidity wall, so the checks are about moisture.
- Look for staining, soft spots or mould on any existing wall or on the framing behind it.
- Check the windows, and the joint where the enclosure meets the house, for stains, rust at fasteners and soft trim. If you want a water test, have a window or enclosure contractor do it rather than hosing the joint yourself.
- Ask whoever enclosed the lanai what the wall is made of and how moisture was handled.
We use moisture-resistant board on lanai walls where it makes sense. If we see signs the enclosure itself is trapping moisture, we will point them out before boarding over it. If the walls are damp, fix the cause first. Board over a wet wall tends to stain or grow mould, and the money is wasted.
Will the dust get into my house?
We take dust seriously and work to keep it out of the house. A full garage or lanai board-out is a dusty job, so closing it off properly matters. On bigger jobs like that, we set up plastic sheeting and HEPA vacuum clean-up, not a bedsheet over the doorway. On a small patch it is usually drop cloths and a careful clean-up before we leave.
You can help in three ways:
- Close the door between the garage and the house.
- Tape or cover any vents on the garage side.
- If the AC return is near the work, turn the AC off and cover the return while we are sanding.
Before you hire anyone, ask how they handle dust. How to Hire for Garage & Lanai Drywall Without Getting Burned covers the other questions worth asking.
What does the schedule look like?
This is a typical sequence for a three-coat finish. The number of visits depends on the job.
| Step | What happens | Usually |
|---|---|---|
| Photo quote | We look at board type, ceiling and texture from your photos | Before anything is booked |
| Boarding | Board hung on walls and ceiling | First visit |
| Taping and first coat | Joints taped and first coat of compound | First visit |
| Second and third coats | Compound applied, dried between coats | Second visit |
| Sanding and texture | Sanded smooth, texture matched if the garage adjoins finished space | Final visit, timing in your quote |
Your actual timeline comes with your quote, because it depends on the size of the garage, the ceiling and how many coats the finish needs. The mud has to dry properly between coats, and humid weather slows that down, so a coat is not something to rush. Larger garages, tall ceilings and heavy ceiling work take longer. For more on why timing varies, see How Long Does Garage & Lanai Drywall Take?
Do I need to be home?
Not the whole time, but someone should be reachable by text. We need the garage open when we arrive and a spot to run a vac and set up. Tell us about pets, a shared driveway or any access limits, such as an HOA gate code.
What about texture and paint?
If the garage adjoins finished space, we match the house texture, knockdown or orange peel. If it is purely a garage, we leave it clean and simple. Decide which you want before we start.
Paint is a separate step. The compound has to be fully dry before primer and paint, and how long that takes depends on thickness and humidity. We can prime the walls so they are ready for paint, or paint them if you want us to. The garage and lanai drywall page covers what the job includes.
How do I get a price before I prepare anything?
Text photos of the garage or lanai to (352) 561-3616: a wide shot of each wall, the ceiling and anything that looks damp. You get a price from the photos before anything is booked, without waiting at home for a two-hour appointment window. Cavender Drywall is based in Minneola and covers Lake County and much of Orange County, from Clermont and Groveland to Winter Garden and Apopka.
Quick answers
What do I need to clear before garage drywall starts?
Cars, shelving, bikes, workbenches and anything leaning against or hung on the walls, plus a clear path to the ceiling. The perimeter of the garage needs to be empty.
Do I have to move out of the house during garage drywall?
No. On bigger, dustier jobs like a full garage or lanai board-out we set up plastic sheeting and HEPA vacuum clean-up, so you can usually stay home. You will hear the work, and the door between garage and house is best kept shut.
How long will the garage be out of use?
It depends on the size of the garage, the ceiling and the finish. The mud has to dry properly between coats, so anything with three coats runs across two visits. We give you an expected timeline with your quote.
What should I check on a lanai before it is boarded?
Check that the walls are dry, that any leaks are fixed, and that the enclosure is not trapping moisture behind where the board will go. Board over a damp wall will often stain, swell or grow mould.